A regional plan that proposes how the long-term challenges facing water supplies in South East England should be met has been published for consultation.
The draft regional plan, produced by Water Resources South East (WRSE), identifies the need for more than £15 billion of investment over the next fifty years to cut leakage, lower water use, build new water sources and transfer supplies to the water-scarce south-east region from other parts of the country.
It sets out the action needed to increase the region’s resilience to drought and avoid a potential 0.8 billion litre per day shortfall in water supplies by 2035.
This could rise to 2.7 billion by 2075, which is around 40 per cent of the total amount of water currently provided each day by the six water companies that operate across the region.
The shortfall in water supplies is being driven by the need to address climate change and population growth, alongside delivering long-term improvements to the region’s environment.
READ MORE: Southern Water withdraw controversial drought plan for River Test
More than half the investment in the draft regional plan will enable water companies to reduce how much water they abstract from their existing sources, including many of the region’s chalk streams and groundwater.
By 2050, more than 1.2 million litres of extra water could be left in the environment, to help it adapt to the long-term impacts of climate change.
The draft plan will also increase the resilience of the region’s water supplies to severe drought, achieving the Government’s target for water supplies to be resilient to a one in-500-year drought by 2040.
This comes following one of the driest years on record, with drought declared across much of the country and the whole of South East England.
The plan includes at least halving leakage from water companies’ and customers’ pipes alongside lowering household water use by around 40 litres per person per day by 2050.
Achieving this could provide more than half the water needed to secure supplies for the future, however, it is dependent on the Government taking action to introduce new policies to embed water efficiency across society.
A range of interventions are needed, including the implementation of a mandatory water label, minimum standards for all water-using products and tighter standards for water efficiency for new houses in building regulations.
Between 2025 and 2035 the draft plan identifies the need to:
· Complete the construction of one new reservoir in Hampshire and start building three more in Oxfordshire, Kent and West Sussex
· Use the Grand Union Canal to transfer water from the Midlands to South East England
· Develop six water recycling schemes in Kent, Sussex, London, Hampshire and the Isle of Wight to supplement water supplies
· Build one desalination plant in Sussex.
Between 2035 and 2075 the draft plan proposes to:
· Develop a further six water recycling schemes across the region
· Transfer more water from the Midlands and the North West using the River Severn and the River Thames
· Build desalination plants in five locations in Kent
· Build one new reservoir in East Sussex
· Store extra water underground at three sites.
The draft plan also identifies opportunities to share more water between the six water companies.
By 2075, the amount of water moved around the region could increase from 400 million litres per day to 1,400 million litres per day, enabling water companies to make the best use of the water resources that are available.
Chris Murray, Independent Chair of WRSE, said: “The drought that developed over the summer affected most of the country and reinforced the need for us to invest in our collective water resources, so we mitigate the climate emergency, provide long-term protection to the environment, and avoid the far-reaching economic and societal consequences that emergency restrictions to water supplies would bring."
SEE ALSO: Hosepipe ban lifted in Hampshire and the Isle of Wight by Southern Water
It is the first time that a regional plan of this nature has been prepared.
Mr Murray added: “The draft regional has been developed through a collaborative process with water companies, regulators, other water users, customers, and stakeholders.
"It is critical that this collaboration continues beyond this consultation and through into the urgent planning and delivery of the schemes that will provide more water and the action needed to reduce demand, both of which are vital to securing our future water supplies.”
To find out more about WRSE’s draft regional plan and respond to the consultation - which is open until February 20, 2023 - visit wrse.org.uk.
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules here